REFERENTIEOVERZICHT VROEGH-EDC
In onderstaand overzicht vindt u een selectie uit onze recentste projecten.
Wilt u meer informatie over een specifiek project, aarzel dan niet om even contact met ons op te nemen.
We vertellen u er graag meer over.
| Periode | Project | Opdrachtgever |
|---|---|---|
| 2019-2020 | Design & Project Management of three bridges in Muiden | Van der Zalm Metaalindustrie B.V. |
| 2019-2020 | Design Aalsmeerderbrug | VO, DO, UO | Hakkers B.V. |
| 2019 | Bellmouth design & installation at -50m LAT Borssele project | Van Leeuwen / C-Ventus (VLCV) |
| 2020-2021 |
Project Management – engineering, fabrication and installation with Mammoet of the Waterlandsewegbrug Almere |
Van der Zalm Metaalindustrie B.V. / Reimert Bouw en Infrastructuur Architect wUrck |
| 2020 | Design of 3x pontoons Margriethaven Rotterdam | Hakkers B.V. |
| 2020 |
Design pontoon & walkways of a water inlet for Evides (Biesbosch) |
Van der Zalm Metaalindustrie B.V. |
| 2021 |
MBR radius modification of Vertical Injector (design + construct) |
Boskalis Subsea Cables |
| 2022 |
Engineering trial sword for trencher Deep-Dig-It |
Van Oord Offshore Wind B.V. |
| 2022-2024 |
Project management renovation of the Hemsterhuisbrug Den Haag |
Van der Zalm Metaalindustrie B.V. / Dura Vermeer |
| 2022-2023 | Development of underwater anchoring tool including modifications | Hakkers Funderingstechniek |
| 2022-2023 | Spud pole design series Spud 300, 700, 900, 1200 | De Gerlien van Tiem B.V. |
| 2022 | Sliding quadrant design |
N-Sea |
| 2022-2023 | Design of a piling frame for accurate positioning of foundation piles onboard of the working vessel Thomas | Van der Zalm Metaalindustrie B.V. / Van den Biggelaar Grond- en waterbouw |
| 2022-2023 |
Modifications to Sennebogen 6180 – 15t powerpack frame |
Hakkers B.V. |
| 2023 |
Design of loading tower |
SCA-Asset UAE |
| 2023 | Drafting support jetty works Ohio | Van den Biggelaar Grond- en waterbouw |
|
2023 |
3D scan and engineering for modifications sandclass installation incl. Sump design, piping works, etc. | Dekker Groep |
| 2023 | Engineering guidance works Zaanbrug | Reimert Bouw en Infrastructuur |
| 2023 | Meanderbrug (Amstelveen) UO drawings and workshop drawings | Van der Zalm Metaalindustrie B.V. |
| 2023 | Mooring piles, walkways, stairs Minervahaven Amsterdam | Hakkers B.V. |
| 2023 | Design and engineering of a Car drop-off pontoon Hansweert | De Klerk Werkendam |
| 2024 | Floating pile frame | Van den Biggelaar Grond- en waterbouw |
| 2024 | DJIT design Boskalis | De Klerk Staalbouw |
| 2024 | Fairplay Tennessehaven design works mooring piles and walkways | Hakkers B.V. |
| 2024 | Special lifting tool for exchanging funnels of a sand classification installation at the RR-55 | Dekker Groep |
| 2024 |
Modifications and sump design of the RR-55 |
Dekker Groep |
| 2024 |
Design of a floating platform and gate for the Melkweg Amsterdam |
De Klerk Werkendam / Hakkers B.V. combination |
| 2024 |
Design and engineering of Mooring piles and fenders Oude Wetering |
Gebr. De Koning |
| 2024 |
Several design and engineerings works for Brunsbüttel piling works including:
|
Hakkers B.V. |
| 2024 |
Engineering and drafting of Crash barrier and guidance works Zandkreek locks with 360 tonnes of steel |
De Klerk Werkendam |
| 2024 | Engineering and drafting of Crash barrier and guidance works ROCO (Antwerp) with 400 tonnes of steel | Van der Zalm Metaalindustrie B.V. |
| 2024 | Design of hyperbaric chamber (droogzetkuip) for lock renovations Kreekraksluizen | De Klerk Werkendam / Heijmans |
| 2024 |
Design and engineering of Davits onboard of pontoon Pieter de Klerk |
De Klerk Werkendam |
| 2024 | Design and engineering of pile gripper diameter varying between Ø610mm till Ø1420mm | Hakkers B.V. |
| 2024 |
Complete design of walkway bridge and pontoon including stair for Binnenwaard IJzendoorn |
Dekker Groep |
| 2024 |
Several aluminium offshore gangway designs incl. footing frame and turntable |
Bridges2000 |
| 2024-2025 |
Liftpoint design with a WLL of 105T for a Boulder Clearance Tool. The lift point can be remotely (de)coupled underwater |
Boskalis Subsea Cables |
| 2024-2025 | Full design and engineering (DO, UO and workshop drawings) of new lock doors Helmond | Van der Zalm Metaalindustrie B.V. / Van den Biggelaar Grond- en waterbouw |
| 2024 |
Modification engineering works for the Vluchthavenbrug in Amsterdam |
TAS B.V. / Hollandia Services |
| 2025 |
Design of an aluminium survey pole, including full supply and installation of the product |
Hakkers B.V. |
| 2025-ongoing |
Drafting and technical project management |
Van der Zalm Metaalindustrie B.V. / Dura Vermeer |
| 2025 | Workshop drawings for the Vivian Maier Bridge | Mercon B.V. / Reimert Bouw en Infrastructuur |
| 2025 |
Final design (UO) and workshop drawings for the Haastrechtsebrug, Gouda (fixed and movable sections) |
Van der Zalm Metaalindustrie B.V. / Dura Vermeer |
| 2025 |
Final design (UO) and drafting for the Schipper Staircase, OCI Geleen |
Van den Biggelaar Grond- en waterbouw |
| 2026-ongoing | Drafting for AlsÉÉN railing works, A27 | Van der Zalm Metaalindustrie B.V. / AlsÉÉN |
| 2025 | Engineering of the gangway outrigger frame and boom rest and container grillage | Offshore Independents / Cadeler |
| 2025-ongoing | Engineering of the lifting tool for work platforms, Brunsbüttel | Hakkers B.V. / Ballast Nedam |
| 2025-ongoing | Final design (UO) engineering for the Waterbus pedestrian bridge, Zwijndrecht | Van den Biggelaar Grond- en waterbouw |