Outrigger frames for tidal turbine installation.
To install a tidal turbine, 2 outriggers were required to guide the tugger wires.
Leask Marine / Tadek Offshore
Guidance of steering lines
Vroegh-edc supplied the outrigger frames within 2 weeks in France and also executed an extensive quality control. This all in close cooperation with the end user. The outrigger frames have ultimately been crucial for the successful placement of the tidal turbine. |