Recent projects by Vroegh-edc

2022-11-21T17:25:45+02:00

Bow thrusters

Improved bow thrusters This series of bow thrusters for inland vessels has been developed and optimized in 3D [.....]

2023-06-06T11:47:03+02:00

Seafastening frames

Seafastening frames for Boskalis. For the installation of massflow equipment and offshore support containers, Vroegh-edc design outriggers and [.....]

2022-11-21T17:30:41+02:00

Boulder Clearance Tool XL

Development Boulder Clearance Tool XL. Smooth and efficient operations with the BCT, that was the objective for developing [.....]

2022-11-21T17:31:32+02:00

Installation plan Jetty Sassevaart

Installation plan Jetty (Dienstensteiger) for new locks Terneuzen Vroegh-edc performed the launching-, transport- and installation procedures for the Jetty [.....]

Recent projects by Vroegh-edc

2022-11-21T17:25:45+02:00

Bow thrusters

Improved bow thrusters This series of bow thrusters for inland vessels has been developed and optimized in 3D [.....]

2023-06-06T11:47:03+02:00

Seafastening frames

Seafastening frames for Boskalis. For the installation of massflow equipment and offshore support containers, Vroegh-edc design outriggers and [.....]

2022-11-21T17:30:41+02:00

Boulder Clearance Tool XL

Development Boulder Clearance Tool XL. Smooth and efficient operations with the BCT, that was the objective for developing [.....]

2022-11-21T17:31:32+02:00

Installation plan Jetty Sassevaart

Installation plan Jetty (Dienstensteiger) for new locks Terneuzen Vroegh-edc performed the launching-, transport- and installation procedures for the Jetty [.....]