Installation plan Jetty (Dienstensteiger) for new locks Terneuzen

Vroegh-edc performed the launching-, transport- and installation procedures for the Jetty (Dienstensteiger) and Bridge (Dienstenbrug).

van der Zalm metaalindustrie

Procedures for launching, transportation and installation

The Jetty and Bridge (together 450 mT) for the ‘Dienstenhaven’ of the new build Locks of Terneuzen has been designed and manufactured by Van der Zalm Metaalindustrie.

Writing procedures

Vroegh-edc has written the launching-, transportation- and installation procedures.

Photography: Arie Mastenbroek.

For this project a few smart and innovative tools have been developed in order to smoothly couple the floating jetties underwater.