Corrosion resistant steel bridge ‘Cirkelbrug Waterlandseweg’.
The new bridge is suitable for cyclists and pedestrians. Vroegh-edc was responsible for the Project Management of the entire process.
Van der Zalm Metaalindustrie B.V.
Project-management from start to end.
The ‘Cirkelbrug’ is a corrosion resistant steel bridge with an overall length of 240 meter. Designed for cyclists and pedestrians.
Impressive spiral staircase
The bridge runs over a channel and busy highway. The bridge also has a spiral staircase in the roadside of the highway in order to gain access to the bridge from the bus stop.
Project Management
Vroegh-edc performed the Project Management of the bridge from the design phase up to and including the assembly phase.
Photography: Arie Mastenbroek.