3 new bridges for the Township ‘Gemeente Gooise Meren’.

On behalf of Van der Zalm Metaalindustrie, Vroegh-edc constructed 3 different bridges and placed them in close coordination with the main contractor and client.

VAN DER ZALM METAALINDUSTIE

Engineering traffic bridge and 2 cyclist- and pedestrian bridges

Vroegh-edc carried out the full 3D detailed design of the 3 bridges for Van der Zalm Metaalindustrie, including workshop drawings. The cyclist bridge is a rotatable bridge with a slewing ring as mechanism and locking pins for securing the bridge in closed position. The design was executed according the Dutch VOBB design rules.

Project-, fabrication- and installation support

Besides the design, Vroegh-edc also executed the Project Management, fabrication and installation support.

Photography: Arie Mastenbroek.

Transport and installation where carried out safely and in close cooperation with Van der Zalm Metaalindustrie, Reimert Bouw en Infrastructuur and Township Muiden.