Recent projects by Vroegh-edc
Sliding Quadrant
Development Sliding Quadrant. Vroegh-edc has developed a Sliding Quadrant to install the '2nd-end' of an offshore power cable at [.....]
Bow thrusters
Improved bow thrusters This series of bow thrusters for inland vessels has been developed and optimized in 3D [.....]
Strength calculations of overflow valves for MS Amistade
Strength calculations of overflow valves for MS Amistade. Vroegh-edc performed the design and engineering of new build overflow [.....]
Seafastening frames
Seafastening frames for Boskalis. For the installation of massflow equipment and offshore support containers, Vroegh-edc design outriggers and [.....]
Modification Vertical Injector
Depressor modification Vertical Injector. The Vertical Injector will be applied for the installation and burial of power cables [.....]
Boulder Clearance Tool XL
Development Boulder Clearance Tool XL. Smooth and efficient operations with the BCT, that was the objective for developing [.....]
Installation plan Jetty Sassevaart
Installation plan Jetty (Dienstensteiger) for new locks Terneuzen Vroegh-edc performed the launching-, transport- and installation procedures for the Jetty [.....]
Construction Cirkelbrug (bridge) Waterlandseweg
Corrosion resistant steel bridge 'Cirkelbrug Waterlandseweg'. The new bridge is suitable for cyclists and pedestrians. Vroegh-edc was responsible [.....]
New pontoons for the Margriethaven (Port in Rotterdam)
New pontoons for the Margriethaven (Port in Rotterdam). For the 'Margriethaven' in the Port of Rotterdam there was [.....]
Cyclist Underpass ‘Aalsmeerderbrug’
Engineering and installation of the Cyclist Underpass 'Aalsmeerderbrug'. The Cyclist Underpass exists of 3 sections and was designed by [.....]
Cyclist- and traffic bridges in Muiden
3 new bridges for the Township 'Gemeente Gooise Meren'. On behalf of Van der Zalm Metaalindustrie, Vroegh-edc constructed [.....]
Outrigger frames for tidal turbine installation
Outrigger frames for tidal turbine installation. To install a tidal turbine, 2 outriggers were required to guide the [.....]
Recent projects by Vroegh-edc
Sliding Quadrant
Development Sliding Quadrant. Vroegh-edc has developed a Sliding Quadrant to install the '2nd-end' of an offshore power cable at [.....]
Bow thrusters
Improved bow thrusters This series of bow thrusters for inland vessels has been developed and optimized in 3D [.....]
Strength calculations of overflow valves for MS Amistade
Strength calculations of overflow valves for MS Amistade. Vroegh-edc performed the design and engineering of new build overflow [.....]
Seafastening frames
Seafastening frames for Boskalis. For the installation of massflow equipment and offshore support containers, Vroegh-edc design outriggers and [.....]
Modification Vertical Injector
Depressor modification Vertical Injector. The Vertical Injector will be applied for the installation and burial of power cables [.....]
Boulder Clearance Tool XL
Development Boulder Clearance Tool XL. Smooth and efficient operations with the BCT, that was the objective for developing [.....]
Installation plan Jetty Sassevaart
Installation plan Jetty (Dienstensteiger) for new locks Terneuzen Vroegh-edc performed the launching-, transport- and installation procedures for the Jetty [.....]
Construction Cirkelbrug (bridge) Waterlandseweg
Corrosion resistant steel bridge 'Cirkelbrug Waterlandseweg'. The new bridge is suitable for cyclists and pedestrians. Vroegh-edc was responsible [.....]
New pontoons for the Margriethaven (Port in Rotterdam)
New pontoons for the Margriethaven (Port in Rotterdam). For the 'Margriethaven' in the Port of Rotterdam there was [.....]
Cyclist Underpass ‘Aalsmeerderbrug’
Engineering and installation of the Cyclist Underpass 'Aalsmeerderbrug'. The Cyclist Underpass exists of 3 sections and was designed by [.....]
Cyclist- and traffic bridges in Muiden
3 new bridges for the Township 'Gemeente Gooise Meren'. On behalf of Van der Zalm Metaalindustrie, Vroegh-edc constructed [.....]
Outrigger frames for tidal turbine installation
Outrigger frames for tidal turbine installation. To install a tidal turbine, 2 outriggers were required to guide the [.....]

