Mooring piles can ship guides bridge Oude Wetering
On behalf of Gebr. De Koning and Knookstaal, Vroegh-edc has designed new ship guides and mooring piles near the bridge Oude Wetering in the Council of Haarlemmermeer.
Gebr. De Koning
Complete workshop drawings
Based on supplied Basic Design drawings, we have produced 3D models in Inventor for both the mooring piles for commercial shipping, mooring facilities for recreational shipping and the renovation of the wooden braking works. From these models, we then created Detailed Design drawings for approval by the client. After approval, the workshop drawings were immediately produced.
Multiple sub-assemblies
For the workshop drawings, we have built up the models in multiple sub-assemblies. This allowed the workshop of Gebr. De Koning to achieve a much faster turnaround time. The new braking works and mooring facilities have now been installed.